APPLICATION OF PERT FOR INSTALLATION OF INFORMATION TECHNOLOGY SYSTEMS IN BANKS.

AUTHOR: EZEANATA, CHUKWUEMEKA ISRAEL MSc

FEDERAL UNIVERSITY OF TECHNOLOGY OWERRI, IMO STATE, NIGERIA

This research work is an application of PERT ford installation of information technology systems in bank. Problems militating against Information Technology system and allied products in banks include: Cost of Implement. Lack of acceptance, and pricing as well as Technical standards. Members of staff of information technology departments in banks were interviewed, also survey questionnaire were administered to users of information technology systems in the banks.

Using the project management technique of Project Evaluation and Review Technique, an optimum cost schedule (budget) was developed as well as the  best and worse completion times for application of PERT for installation of  information technology systems in banks. The analyses of coefficient of ranked correlation, rejected the null hypothesis, and accepted the alternate hypothesis of strong positive relationship, between increased work performance and acceptability of appropriately installed information technology systems in the three sets of old as well as new  generation banks that were studied.

  1. Also the analyses of coefficient of ranked correlation rejected the null hypothesis and accepted the alternate hypothesis of strong positive relationship  between the application of user’s requirement process and high acceptability of information technology systems by users in all the three sets of  old generation banks as well as two sets of new generation banks that were studied. The  research concluded that the adoption of the project management technique PERT, will go a long way to providing optimum cost schedule for application of PERT for installation of information technology systems in bank s and that low return on investment of Information technology systems in banks may not be attributed to work performance of and or acceptability by end users but to poor communication network as well as unstable electric power supply infrastructure in Nigeria. The research recommended that systems development project managers should do well to adopt the Project Evaluation and Review Technique, PERT for installation of information Technology Systems  in banks.

TO VIEW THE FULL CONTENT OF THIS RESOURCE, PLEASE VISIT THE FUTO    LIBRARY

Advertisements

About FUTOLibrary

This is the site which is used to showcase the resources, operations and services of the University Library of the premier university of Technology in Nigeria. We have so much indigenous resources which people may wish to look at and use .
This entry was posted in School of Management Technology SMAT, The Library and tagged , , . Bookmark the permalink.

2 Responses to APPLICATION OF PERT FOR INSTALLATION OF INFORMATION TECHNOLOGY SYSTEMS IN BANKS.

  1. I appreciate your application of pert to the banking institution but there’s the need to explain in discreet terms how it enhances productivity as well as it’s demonstrable applicability

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s